Frequently Asked Questions

Straight answers to the questions people in Throsk, Fallin and Cowie are most likely to ask.

What is being proposed at Bandeath?

A 49 MW data centre on Council land at the lower end of Bandeath Industrial Estate, Throsk. It would supply waste heat to local homes and pay a legally binding community fund to Throsk, Fallin and Cowie. At this stage it is a proposal for the Council to scope, not a planning application.

Has the Council agreed to this?

No. Councillor Alasdair MacPherson has asked the Chief Executive of Stirling Council to commission a scoping exercise. Any development would need a full planning application, environmental assessment and public consultation.

How much would the community receive?

At 49 MW, about £1.225m a year, index-linked, rising to about £1.8m a year if the fund is linked to 3% of the campus’s revenue. It would be split Throsk 50%, Fallin 40% and Cowie 10%.

Will a data centre push up our energy bills?

Household energy tariffs in Great Britain are set nationally by Ofgem, so the campus would not create a higher local tariff. The proposal is designed to cut local bills through cheaper heat and an energy-bill credit for every Throsk household, and the operator would pay its own grid connection costs.

How much could my household save?

Estimates at 49 MW are about £1,150–£1,250 a year for a Throsk household, about £525–£625 for a fuel-poor Fallin household on the heat network, and about £100 for a fuel-poor Cowie household, rising if the heat network reaches Cowie.

Will it use a lot of water?

No. The proposal is for closed-loop cooling using the River Forth and minewater for heat exchange, not evaporative cooling towers. After the initial fill, ongoing water use would be low.

How many jobs would it create?

About 60–100 permanent jobs at 49 MW, plus several hundred construction jobs over two to three years. Local residents would get priority, starting with Throsk, then Fallin, then Cowie.

Is the old munitions depot safe to build on?

The site’s history means unexploded ordnance and contamination must be investigated before any work starts. These risks are well understood and can be managed. The developer would pay for the clean-up.

Isn’t the site on a flood plain?

Yes. The buildings would be placed on the highest ground and raised above the design flood level, with replacement flood storage and safe access. Flood modelling with SEPA is one of the first steps.

Will it be noisy?

There is no housing at the lower end of the estate. Planning conditions would set strict noise limits at the nearest homes in Throsk, and back-up generator testing would be capped.

Why not build a much bigger hyperscale campus?

A larger campus would need a transmission grid connection, would be decided by Scottish Ministers, would push onto more flood-prone land and would produce far more heat than local homes could use. The plan is to start at 49 MW and keep expansion as a later phase.

Who would decide how the community fund is spent?

A community-led trust with a panel in each village. The operator would have no say in how the money is spent.

When could it happen?

The realistic aim before May 2027 is a Council decision to scope the site. National planning guidance is expected in 2027, a planning application could follow in 2028–29, and first power around 2030–31.