Proposal · Bandeath Industrial Estate, Throsk
Bandeath Green Compute & Heat
A proposal for a 49 MW data centre at Bandeath that puts cheaper heat, lower energy bills and a fair share of the profits in the hands of Throsk, Fallin and Cowie.
What the proposal could mean for local people
Bandeath was an Admiralty munitions depot for more than sixty years. Today the lower end of the estate sits beside the River Forth with no housing next to it, close to Scotland’s main north–south electricity route. This proposal asks Stirling Council to test whether that land could host a mid-sized, heat-producing data centre built around the needs of the surrounding villages.
All figures are desk-based estimates (±50%) from a pre-feasibility study. They must be tested by Council officers, SEPA, SP Energy Networks and specialist surveys before any decision is made.
Who benefits
The community fund would be shared between the three villages most affected by the development, based on how close each is to the site and how much each would be affected by it.
Host community · 50%
Throsk
£612,500 a year at 49 MW. First on the heat network, with an annual energy-bill credit for every household and a legacy fund for the future.
Closest village · 40%
Fallin
£490,000 a year at 49 MW. Heat-network connections, warm-homes grants, apprenticeships and support for Fallin’s minewater and community energy projects.
Visual impact · 10%
Cowie
£122,500 a year at 49 MW. Tree planting and screening, community grants and skills bursaries.
How the community fund would work →
How it would work
Power from the grid
A data centre of this size runs on grid electricity, largely Scottish wind power, and connects through the local network. Minewater and the river cannot power it, but they can make it far more efficient.
Waste heat for local homes
Servers produce a steady supply of low-grade heat. Heat pumps can raise it to warm homes through a district heat network, starting with Throsk and Fallin.
Minewater and the Forth
The flooded Polmaise workings and the River Forth can cool the halls without evaporating water, and the old workings can store summer heat for winter.
A binding community deal
Payments are secured by a Section 75 agreement and the Council’s lease, index-linked, paid from the start of construction, and rising automatically if the campus grows.
Read about power, heat and renewables →
Facing the hard questions
Opposition to AI data centres is growing across central Scotland, and much of it is well founded. The proposal tackles the main concerns directly.
- Will it push up our energy bills? Household tariffs are set nationally, and the proposal is designed to cut local bills.
- Who profits? The developer could earn £45–£70m a year. The proposal asks for a revenue-linked share for the community.
- Is the old munitions depot safe to build on? Unexploded ordnance and contamination are expected and can be dealt with.
- Isn’t it on a flood plain? Yes. The design must raise the site and protect flood storage.
- Why not build a hyperscale campus? Phasing keeps the larger prize in reach without the risks.
Where things stand
- Now to May 2027. Ask the Council to commission a scoping study and adopt a community-benefit policy.
- 2027. National data centre planning guidance is published. The scheme is tested against it.
- 2027–28. Developer selection and at least 12 weeks of community consultation.
- 2028–29. Planning application, with the Section 75 agreement and lease signed together.
- 2029–31. Construction, first power and the heat network to Throsk and Fallin.
About this website
Published by Councillor Alasdair MacPherson
If you get the location right and you can demonstrate significant community benefit, some community – and the Council – could hit the jackpot.
This website sets out a proposal raised with the Chief Executive of Stirling Council. It is a discussion paper, not a Council decision.