Electricity for the campus has to come from the grid. Minewater and the River Forth turn the campus into a heat supplier for the villages, and that is what makes Bandeath different.
Connecting to the grid
A 49 MW campus uses about 400 GWh of electricity a year, far more than any on-site renewable here could produce. Being close to the Beauly–Denny pylons helps with routing, but a data centre cannot tap a 400 kV line directly. It connects through a substation, which SP Energy Networks and the National Energy System Operator would have to approve.
A 26 MVA green power supply has already been promised to a neighbouring plot at Bandeath. That suggests a 25–49 MW scheme could connect through the local distribution network, outside the congested national transmission queue.
What each resource can realistically do
| Resource | What it can do | Value to the scheme |
|---|---|---|
| Minewater (Polmaise workings) | A steady, cool heat source and sink. It can cool the halls in summer and store waste heat for winter. It generates no electricity. | High: builds on Fallin’s minewater feasibility work |
| River Forth | River-source cooling and heat pumps. A river-source heat pump already has planning consent at Bandeath. Tidal power is not viable in this stretch. | High for cooling and heat |
| Data centre waste heat | Liquid-cooled servers give off heat at 30–50°C, which heat pumps can raise to 70°C for homes. | Very high: the community-benefit engine |
| Solar on spare Council land and roofs | About 10 MWp, supplied by private wire to the campus. | Medium: Council and community income |
| Battery storage | Smooths load swings and earns grid-balancing income. | Medium |
| The grid | Supplies 95% or more of the power, largely from Scottish wind. | Essential |
A heat network for Throsk, Fallin and Cowie
Heat-network pipework costs roughly £3,000–£5,000 a metre, so every kilometre matters. Throsk is beside the estate, Fallin is about 2.5 km away and Cowie is further. A phased network makes sense:
- Phase 1: Throsk, the cheapest and quickest connection.
- Phase 2: Fallin, linking with the Fallin minewater project.
- Later phase: Cowie, if the costs stack up.
The developer should pay for the heat-recovery plant, with the network built with support from the Scottish Government’s Heat Network Fund. Connected households would be guaranteed heat at least 10% below the gas or electric equivalent.
Water use
The campus would use closed-loop cooling with river and minewater heat exchange, not evaporative cooling towers. Industry figures put the initial fill of a closed-loop system at roughly the annual water use of 44 homes, with low ongoing use after that.